CAN/ULC-S1001 is Canada's Standard for Integrated Systems Testing of Fire Protection and Life Safety Systems. It defines the methodology for verifying and documenting that all interconnections between fire protection and life safety systems are installed and operating in conformance with their design.
Before 2020, each system in a building — fire alarms, sprinklers, elevators, HVAC — was tested individually. It was simply assumed those systems would work together properly in an emergency. CAN/ULC-S1001 ended that assumption. Today, proving that these systems work together is a legal requirement.
.png/:/rs=w:400,cg:true,m)

The Canadian Federal Government mandated Integrated Systems Testing to ensure all fire protection and life safety systems work together.

Integrated Systems Testing must be performed again 1 year after initial testing — then every 5 years thereafter.

Any building with two or more interconnected life safety systems is subject to the standard. Individual testing alone is no longer sufficient.
CAN/ULC-S1001 defines a structured two-phase process. Both phases require an independent, qualified Integrated Testing Coordinator (ITC) — and both generate documentation that must be submitted to your Authority Having Jurisdiction (AHJ).
Design professionals — engineers, architects, electricians — send documentation detailing each system interconnection to the Integrated Testing Coordinator. The ITC then prepares a complete, building-specific Integrated Testing Plan.
Before testing begins, the ITC must receive confirmation that all systems are installed, accepted, and ready. The ITC then runs all scenarios in the Testing Plan, with all key parties present onsite.
Ontario Building Code — Section 3.2.10.1

Please contact us at info@apsfi.ca if you cannot find an answer to your question.
Yes. The Ontario Building Code requires all fire protection and life safety systems to comply with CAN/ULC-S1001 where those systems are integrated with each other. If your building has two or more interconnected life safety systems — which is virtually every commercial, institutional, industrial, or multi-residential building — this standard applies to you.
Twice. First, the Integrated Testing Plan — including the name of the Integrated Testing Coordinator — must be submitted prior to construction beginning. Second, the completed Integrated Testing Report and all related documentation must be submitted prior to occupancy. The specific submission process varies by municipality, so it's important to check with your local planning department early in the project.
Integrated Systems Testing is not a one-time obligation. Retesting is required 1 year after the initial test. Subsequent testing must then be conducted at intervals not exceeding 5 years. Building owners are responsible for maintaining these schedules and keeping all records current.
No. CAN/ULC-S1001 explicitly prohibits the same company from performing both fire alarm verification (under CAN/ULC-S537) and Integrated Systems Testing on the same building. The Integrated Testing Coordinator must be a separate, independent organization. This independence is what makes the testing credible and compliant.
Yes, with some nuance. For existing buildings with a prior Integrated Testing Report undergoing renovation, only the affected systems need to be retested. However, for existing buildings where integrated testing has never been done, a full new Integrated Systems Testing Plan must be prepared — following the same process as a new build. Many existing buildings are in this situation without their owners realizing it.
Leaving IST to the end — or skipping it entirely — puts your occupancy permit at risk. Deficiencies discovered during a late-stage inspection must be corrected and retested before you can occupy the building. This can push your completion date back by weeks or months and result in significant unplanned labour costs. Building Integrated Systems Testing into your project plan from day one is far less expensive than managing it as an emergency at the end.
APS Fire & Integration provides independent, ULC Certified Integrated Testing Coordination for new construction, renovations, and existing buildings throughout Ontario. We guide you through every step — from your first planning submission to your final occupancy report.
Copyright © 2026 APS Fire & Integration - All Rights Reserved.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.